SPIRAL2 accelerator construction progress

Abstract

The installation of the SPIRAL2 superconducting accelerator at GANIL is almost started. All the major components have been tested in the various partner laboratories, and the building construction is now well engaged. The management of the interfaces between the process and the buildings is a strategic point in an underground accelerator, with strong space constraints. This paper describes the performances of the various components.

Keywords

Fichier principal
Vignette du fichier
th2a02.pdf (1.81 Mo) Télécharger le fichier
Origin Files produced by the author(s)
Loading...

Dates and versions

in2p3-00737574 , version 1 (29-08-2013)

Identifiers

  • HAL Id : in2p3-00737574 , version 1
  • INSPIRE : 1364209

Cite

Pierre Bertrand, R. Ferdinand. SPIRAL2 accelerator construction progress. XXVI Linear Accelerator Conference - LINAC12, Sep 2012, Tel Aviv, Israel. pp.773-777. ⟨in2p3-00737574⟩
72 View
110 Download

Share

Gmail Mastodon Facebook X LinkedIn More