The SARAF-LINAC project status
N. Pichoff
(1)
,
N. Bazin
(1)
,
L. Boudjaoui
(1)
,
P. Bredy
(1)
,
D. Chirpaz-Cerbat
(1)
,
R. Cubizolle
(1)
,
B. Dalena
(1)
,
G. Ferrand
(1)
,
B. Gastineau
(1)
,
P. Gastinel
(1)
,
P. Girardot
(1)
,
F. Gougnaud
(1)
,
P. Hardy
(1)
,
M. Jacquemet
(1)
,
F. Leseigneur
(1)
,
C. Madec
(1)
,
N. Misiara
(1)
,
P. Nghiem
(1)
,
F. Rossi
(1)
,
D. Uriot
(1)
,
Pierre Bertrand
(2)
,
M. Di Giacomo
(2)
,
R. Ferdinand
(2)
,
J.M. Lagniel
(2)
,
J.F. Leyge
(2)
,
M. Michel
(2)
Résumé
SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and
proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the superconducting linac (SARAF-LINAC Project).
This paper presents to the accelerator community the status at March 2016 of the SARAF-LINAC Project.